UNIVERSAL HOTEL FLORIDA

MAGALUF (Calvia). ESPAÑA
2022
Control, VRF, Restaurants, Hotels, ECOg Gas Heat Pump
Outdoor units:
Indoor units:
Challenge
Solutions & Tech Applied
The innovation of the project lies in the use of GHP equipment for the air conditioning of the main building (which, being a seasonal hotel, has a guaranteed occupancy rate of 70–100 %); this also ensures the recovery of DHW to cover the hotel's demand. DHW production is instantaneous thanks to the installation of multi-energy cylinders. For the remaining 3 buildings, which consist of 60 apartments, the Mini ECOi solution with low-silhouette duct terminal units has been chosen. Finally, for the restaurant, which is south-east facing and enclosed with a large window and has a high occupancy, an ECOi unit with 14 kW ducted units was chosen. Among its most relevant features are reduced condensation and low noise levels.
The client's expectations for efficient and sustainable air conditioning have been fully met thanks to the choice of aerothermal equipment with DHW recovery. The return on investment will be practically immediate as there is no need to contract more electrical power or install transformer equipment. The hotel chain has approved this system for its other hotels with similar characteristics.
Key Tech Features
Connected in parallel with a 3000 litre manifold and buffer tank.
The dining room is air-conditioned with high pressure ducted indoor units and a VRF system.