When a top London restaurant opened, it needed large volumes of fresh air to ensure the optimum dining environment. ECO G units connected to the cooling coils within the air handling equipment ensured the air was introduced in the right condition in both summer and winter.
Chiller replacement. Chilled water supply to fan coils
Chiller replacement.When some old chillers needed replacing at the end of their operational lifetime, ECO Gs with Water Heat Exchangers enabled the project to be carried out in stages whilst still utilising the existing water pipe work and fan coils. This enabled the project to be delivered on time, to a restricted budget and avoided all issues regarding refrigerant in confined spaces.
Connection to ‘close control’ computer equipment
- Input electricity Nat. Gas
- Low pressure hot water supply
- Feed
- Return
- 100mm CHW F&R
- Cooling load room A
- Cooling load room B
- Air Cooled Chiller
- Package auto fill unit
- 100 Litre pressure vessel
- 65mm CHW F&R
- 150mm header
This drawing is copyright. // 1. Do not scale this drawing // 2. Errors / omissions to be immediately notified to the Engineer. // 3. All dimensions to be checked on site.